Monday, May 5, 2014

Pictures from the last week

cleaning the hold
After delivery of the cargo the hold must be cleaned.Its 70x10m. It takes +/- 3-4 hours with 4 men.
First cleaning dry with a sweep. Then with a hose. Then take the water away. Clean the bilges. etc etc.
You sleep good after ;)

Arrival in the port of Rotterdam. We are standing on the forepeak for mooring the ship.




Mooring equipment on the front deck:
These are the winches used for mooring.You also see the anchors SB and BB


A tug assisted us in the port of Ghent:


Unloading the rape meal at the port of Marin:






No comments:

Post a Comment